What is an airport feasibility study?
A feasibility study is a preliminary planning project that develops basic operational, financial and. environmental information about a proposed airport and justifies bringing an airport into the FASP.
What factors are commonly taken into consideration in planning the airport terminal area?
What factors are commonly taken into consideration in planning the airport terminal area? Passengers, vehicles, airport operations, aircraft, and safety.
What are the factors influencing airport size?
air traffic control separation standards; aircraft characteristics; runway configuration; movement mix; and air traffic control operational strategies. Other factors which influence runway capacity, eg safety, weather, noise, etc, can be shown to act through one or more of these five factors.
What is the major requirement for the job of airport manager?
What Is an Airport Manager?
Degree Required | A bachelor’s degree in most cases, but a master’s may be required for the most advanced positions |
---|---|
Education Field of Study | Aviation management |
Key Skills | Knowledge of safety guidelines, accounting, personnel management |
Job Growth (2018-2028) | 6.9\% for general/operations managers* |
What are the environmental factors which are considered in the development of a new airport?
Every effort should be made to orient air traffic away from noise-sensitive land development. Other important environmental factors include air and water pollution, industrial wastes and domestic sewage originating at the airport, and the disturbance of natural environmental values.
How many factors are used for classifying airports?
1. Airports can be classified on how many basis? Explanation: The airports can be classified into 4 on the basis of take-off and landing, geometric design, based on aircraft approach speed (FAA) and function. 2.
How many areas of feasibility are there in project feasibility study?
There are five areas of feasibility or 5 types of feasibility study, that is measured in a project feasibility study that we have listed here. Let us have a look the components of a feasibility study quickly.
What are the objectives of airport planning?
A key objective of airport planning is to assure the effective use of airport resources in order to satisfy aviation demand in a financially feasible manner. Airport planning may be as broad based as the national system plan or more centrally focused as an airport master plan for a specific airport.
What is technical feasibility and economic feasibility?
Technical feasibility also involves evaluation of the hardware and the software requirements of the proposed system. Economic feasibility of a project helps organizations assess the viability, cost, and benefits associated with projects; before financial resources are allocated.
How do you determine the optimal location strategy?
Based on the business strategy and external factors different location scenarios can be defined and analyzed based on cost, qualitative and risk factors in order to determine to optimal location strategy going forward.